Plug & Abandonment through tubing

Summary

The Operator on the Norwegian Sector of the North Sea had numerous challenges, including collapsed/parted tubing and production casing. Among other options, the customer considered and selected ThermaSet® to solve their challenge.

Below, you get more insight into this case. You may also download your free copy of the case study, which also includes details about how Wellcem implemented the solution and most importantly – the results achieved for the operator company.

The Challenge

  • Collapsed/parted tubing and production casing
  • Lower reservoir pressure than the hydrostatic pressure of sea water – well on vacuum.
  • Plugging of reservoir interval in rig-less intervention
  • Keeping top of plug at a taggable depth. i.e. above parted tubing.

The customers’ options

  • Cement
  • Resins

Why did they choose Wellcem?

Due to a collasped tubular using cement to isolate this well was not a good option. Using cement would run the risk of bridging off and not being to pump the desired volume below the collasped area. Wellcem Resin System gave the ability to pump below the collasped area, setting a plug to fully isolate the in the well.

Download Case Study

Just fill in the blanks and grab your free copy of the full case study today.

Download Case Study

Just fill in the blanks and grab your free copy of the full case study today.

Talk to our dedicated experts

If you’re facing well integrity challenges or have any related queries, our dedicated team of experts are here to help.